
Software Depreciation: Understanding and Using AfA Rules for Companies
In today's digitalized business world, software solutions are the backbone of thousands of German companies. From accounting to customer management to production control – oh...

Assess document volume, publication effort and storage maturity with a conservative investment model.
In brief
For comparable document portals, break-even often falls between 8 and 22 months. Only avoided time for filing, search, and dispatch counts.
The calculation follows six visible stages. All figures remain planning values until scope and assumptions have been reviewed.
1. Capture inputs
The calculator records the visible project, volume, complexity and operating parameters selected on this page.
2. Add fixed components
One-off investment and recurring operating components are added separately.
3. Apply multipliers
Volumes, time values and rates are multiplied where the model converts effort or incidents into monetary effects.
4. Create the range
The calculator applies its documented lower and upper uncertainty factors to the base result; ROI views keep investment and savings visible separately.
5. Round and calibrate
Monetary result fields are rounded to the nearest whole euro. Public project-cost components are calibrated with the centrally maintained display factor.
6. Classify the result
The result is shown as non-binding guidance. A binding quote requires scope, data, integrations, risks and acceptance criteria to be reviewed.
Efficiency or discount factor: A central display factor of 0.7 is applied to public project-cost components to keep all calculators aligned with the currently reviewed pricing basis. It is not a customer-specific discount; customer-entered wages, revenues and existing operating costs are not reduced.
Why this is not a binding quote: The calculator cannot verify complete requirements, third-party dependencies, data quality, legal constraints or acceptance criteria.
Concrete project profiles with assumptions and indicative budgets—useful for internal alignment alongside the calculator.
Calculator overall range
EUR 14,994 – 210,337 excl. VAT
The overall range is derived from the valid parameters of the relevant cost calculator.
Typical duration
Pilot with one document group usually delivered in 8–14 weeks
Main risk drivers
FAQ
It combines monthly document volume, current handling time and process maturity.
Savings include only avoidable work for filing, searching, assignment, publication and repeated delivery.
Recurring invoices, contracts, inspection reports, certificates and technical files with many recipients offer strong potential.
A clear lifecycle and reliable assignment matter more than file size alone.
No.
Roles, versioning and audit trails may reduce risk, while digital retrieval may save postage and questions. These benefits remain excluded so the calculation rests on measurable handling time.

Assess document flow economics
We analyse document types, recipients, roles and source systems to define a defensible portal pilot.
The scope includes protected access, roles, document assignment, search, notifications and one focused source-system connection.
tenant isolation, e-signatures or migration add effort.
Teams must define identities, roles, retention, deletion, download rights and audit logging.
They must also establish the system of record and decide how blocked or superseded documents appear in the portal.
We develop Made in Germany from Leer in East Frisia.
A pilot starts with a small set of document types and one user group; access, findability and delivery are validated before further sources are connected.
| Model | When it fits | Budget & flexibility | Typical risks |
|---|---|---|---|
| Fixed price (fixed scope) | Clearly defined scope, stable requirements, repeatable delivery. | Predictable total cost; little room for change without a change order. | Scope creep leads to change orders or quality trade-offs. |
| Time & Material | Discovery, legacy, evolving requirements, or close collaboration. | Maximum flexibility; budget transparent via hourly or daily rates. | Without prioritisation, effort can grow—backlog and reviews matter. |
| Retainer / maintenance package | Ongoing operations, updates, small features, and support. | Agreed capacity per month; predictable follow-on cost. | Large changes may still need a separate estimate. |
| Hybrid (milestone + T&M) | MVP or phased releases with clear go-lives, then iterate. | Core delivery fixed price; extensions on a time-and-materials basis. | Define contractually what is in scope vs. extra work. |
Calculators on this page provide indicative ranges; we choose the right model with you based on risk, scope, and planning horizon.
The ranges shown are indicative. For a binding quote we discuss scope, priorities and funding options in a free intro call. Many digitalization projects qualify for grants – try our funding calculator.
Browse all cost calculators, explore services and typical solutions. Questions about document portal ROI? Contact us.
After using the document portal ROI calculator, validate assumptions in a short intro call.
Browse all cost calculators in the costs overview.
When do secure retrieval and automated publication pay back?
Interactive estimate based on your inputs.
Non-binding project range from the software cost calculator: EUR 10,332 – 372,623 excl. VAT.
Methodology: The estimates are based on historical project data, complexity drivers and standard implementation assumptions. Results are a non-binding indication only; effort and price must be calculated individually.
If you are still deciding
If you are ready to implement
Four checks: monthly volume, minutes per document, the share of work that actually stops, and what the first release excludes.
1. Count documents, not file size
Recurring invoices, contracts, and reports with many recipients move the month more than large one-off files.
2. Time only avoided work
Filing, search, assignment, delivery, and repeat dispatch. Compliance and postage stay outside the curve.
3. Read 8 to 22 months as the lead range
The category card uses this band. Volume and search effort move a case inside it.
4. Start with one document type
A pilot with one user group checks access and findability before more sources are connected.
Blog posts that put budget, effort and typical project paths for this calculator in context.

Software Depreciation: Understanding and Using AfA Rules for Companies
In today's digitalized business world, software solutions are the backbone of thousands of German companies. From accounting to customer management to production control – oh...

KfW-Kredite for Digitization Projects: Your Way to Modern Software Solution
In today's digital landscape, modernization of business processes is no longer a luxury, but a necessity. However, many small and medium-sized enterprises (SMEs) are facing the...

Avoid Vendor Lock-in: Flexibility in Outsourcing
In today's digital landscape, companies are faced with a fundamental decision in software development: are they relying on **Inhouse vs Outsourcing Software Development**? While...