
Technical debt communicating: How to convince management
**Technical debt** – a term that can often be heard in IT departments, but in management can provide questioning views. Similar to financial debt, technical debt can also be...

Estimate the budget for your database solution – from a clean new build to Access migration and performance optimisation.
In brief
The investment frame for a database solution is EUR 4,284 – 58,711 excl. VAT. Volume, reporting and high availability move the project inside that band.
The upfront cost can be spread over 72 months. Terms are on the software financing page.
Related: Access replacement.
The calculation follows six visible stages. All figures remain planning values until scope and assumptions have been reviewed.
1. Capture inputs
The calculator records the visible project, volume, complexity and operating parameters selected on this page.
2. Add fixed components
Fixed base modules and selected add-ons are added without mixing them with recurring charges.
3. Apply multipliers
Quantity, complexity and scope factors multiply only the cost components identified for them in the calculator model.
4. Create the range
The calculator applies its documented lower and upper uncertainty factors to the base result; ROI views keep investment and savings visible separately.
5. Round and calibrate
Monetary result fields are rounded to the nearest whole euro. Public project-cost components are calibrated with the centrally maintained display factor.
6. Classify the result
The result is shown as non-binding guidance. A binding quote requires scope, data, integrations, risks and acceptance criteria to be reviewed.
Efficiency or discount factor: A central display factor of 0.7 is applied to public project-cost components to keep all calculators aligned with the currently reviewed pricing basis. It is not a customer-specific discount; customer-entered wages, revenues and existing operating costs are not reduced.
Why this is not a binding quote: The calculator cannot verify complete requirements, third-party dependencies, data quality, legal constraints or acceptance criteria.
Concrete project profiles with assumptions and indicative budgets—useful for internal alignment alongside the calculator.
FAQ
The database solutions cost calculator gives EUR 4,284 – 58,711 excl.
VAT as its non-binding overall range. Project type, data quality, volume, user count, reporting, interfaces and availability determine the concrete result.
Optimisation projects are classified within EUR 4,284 – 58,711 excl.
VAT by the database solutions calculator. Analysis, index strategy, query tuning and archiving sit closer to the lower end than a complete rebuild when the scope is clearly bounded.
The challenge is rarely technical – it lies in grown data: duplicates, inconsistent formats, hidden logic in forms and macros.
That is why we price legacy data cleansing as its own work package, keeping the budget realistic.

Discuss your database project
We review data model, legacy data and interfaces and recommend the most economical path.
For most mid-market projects, PostgreSQL or MySQL/MariaDB are the most economical choice: powerful, licence-free and with a large ecosystem.
SQL Server remains sensible where the Microsoft landscape dictates it. We choose based on data volume, integrations and operating model.
A high-availability setup with replication and automatic failover sits in the investment frame.
It pays off when downtime directly costs revenue, such as production control or online shops. For internal reporting, a solid backup concept is usually enough.
A GDPR concept (deletion policies, access roles, pseudonymisation, data processing agreements) is a work package inside the investment frame.
With personal data it is mandatory. Retrofitting costs more than structures planned from the start.
| Model | When it fits | Budget & flexibility | Typical risks |
|---|---|---|---|
| Fixed price (fixed scope) | Clearly defined scope, stable requirements, repeatable delivery. | Predictable total cost; little room for change without a change order. | Scope creep leads to change orders or quality trade-offs. |
| Time & Material | Discovery, legacy, evolving requirements, or close collaboration. | Maximum flexibility; budget transparent via hourly or daily rates. | Without prioritisation, effort can grow—backlog and reviews matter. |
| Retainer / maintenance package | Ongoing operations, updates, small features, and support. | Agreed capacity per month; predictable follow-on cost. | Large changes may still need a separate estimate. |
| Hybrid (milestone + T&M) | MVP or phased releases with clear go-lives, then iterate. | Core delivery fixed price; extensions on a time-and-materials basis. | Define contractually what is in scope vs. extra work. |
Calculators on this page provide indicative ranges; we choose the right model with you based on risk, scope, and planning horizon.
The ranges shown are indicative. For a binding quote we discuss scope, priorities and funding options in a free intro call. Many digitalization projects qualify for grants – try our funding calculator.
Browse all cost calculators, explore services and typical solutions. Questions about database solutions? Contact us.
After using the database solutions calculator, validate assumptions in a short intro call.
Browse all cost calculators in the costs overview.
What does your database solution cost?
Interactive estimate based on your inputs.
Non-binding project range from the software cost calculator: EUR 10,332 – 372,623 excl. VAT.
Methodology: The estimates are based on historical project data, complexity drivers and standard implementation assumptions. Results are a non-binding indication only; effort and price must be calculated individually.
If you are still deciding
If you are ready to implement
Calculator overall range
EUR 16,800–196,000 excl. VAT, depending on product scope
The overall range is derived from the valid parameters of the relevant cost calculator.
Typical duration
2–12 months
Main risk drivers
Non-binding indication
This result is only a non-binding indication based on typical assumptions. Effort and price must be calculated individually for your project.
A transparent four-step process for validating the Database Solutions indication with concrete requirements.
1. Confirm scope and target outcome
We clarify the business outcome, user groups, and boundaries relevant to Database Solutions.
2. Review data, interfaces, and risks
We validate integrations, data quality, security, compliance, and operational dependencies.
3. Check the calculator assumptions
We compare the selected parameters with the real system landscape and document deviations.
4. Prepare the precise quote
You receive a scoped proposal with milestones, exclusions, price model, and next decision point.
Blog posts that put budget, effort and typical project paths for this calculator in context.

Technical debt communicating: How to convince management
**Technical debt** – a term that can often be heard in IT departments, but in management can provide questioning views. Similar to financial debt, technical debt can also be...

ETL processes: extract and combine data from silos
In today's data-driven business world, information is the life elixir of each company. But too often these valuable data are trapped in isolated systems, so-called...

Resolve data silos in the cloud: How to make your data usable
In today's data-driven business world, access to accurate and timely information is crucial for success. Companies that drive digital transformation and C...